I am new to JDE WorldSoft. I would like to know what role do the level break arrays play in the S002 subroutine. How to start a program from scratch that writes a report using level breakes from the dream writer-data sequencing option ?
Do I have to copy the S002 routine entirely from an existing program? If yes where do i make changes after copying?
Also in the mainline program, what is the role of the $SUMZ field? What is the significance of the sequence of S010 AND S004 routines in the mainline programme?
Do I have to copy the S002 routine entirely from an existing program? If yes where do i make changes after copying?
Also in the mainline program, what is the role of the $SUMZ field? What is the significance of the sequence of S010 AND S004 routines in the mainline programme?