Hi,
I have to replace a faulty Universal NSU on a customer site, power supply is dead. I have never had to do this before and I do not think that there is a copy of the NSU database. Do I have to reprogram the NSU after it loads from the Controller. What is the best procedure to use.
I have to replace a faulty Universal NSU on a customer site, power supply is dead. I have never had to do this before and I do not think that there is a copy of the NSU database. Do I have to reprogram the NSU after it loads from the Controller. What is the best procedure to use.