LouPelagalli
Programmer
Hi,
I'm very new to Rexx, and 0S/390 in general.
Here's my problem, I hope you can help.
1. I have and ISPF panel with a Rexx running behind the panel.
2. The Rexx updates the panel each time the Rexx runs with the option selected on that run. There are several jobs to submit in sequence, the idea is to track what was last submitted.
When the Rexx is subsequently run, it the panel does not show the the last run correctly. It appears that once you run it, you're stuck with those display parameters until you back out of ISPF and get back in.
Thank you in advance for your help,
Lou
I'm very new to Rexx, and 0S/390 in general.
Here's my problem, I hope you can help.
1. I have and ISPF panel with a Rexx running behind the panel.
2. The Rexx updates the panel each time the Rexx runs with the option selected on that run. There are several jobs to submit in sequence, the idea is to track what was last submitted.
When the Rexx is subsequently run, it the panel does not show the the last run correctly. It appears that once you run it, you're stuck with those display parameters until you back out of ISPF and get back in.
Thank you in advance for your help,
Lou