We're using BOE XI Release 2.
Background Info: I have a dozen different recurring schedules against one report (Sales Rep Production Report) that takes a parameter: i.e. Sales Rep Name. Each recurring schedule is set with a parameter equal to the different sales rep name. Every month, the system sends the report based on the recurring schedule to each Sales Rep showing ONLY their individual production for the month.

Problem: I revised the report and re-published it to the BOE Server(Info View) by overwriting the existing report. I expected that the existing recurring schedules will continue to run the report with the parameter that was originally set for it. But this is not the case. All the recurring schedules are running using the parameter of the revised report (i.e. Sales Rep Ben Dover) and not the parameter that was set in that schedule for Ben Dover, Joe Blow et. al. Is there a way to fix this without re-creating new re-current schedules. I have a few dozen reports associated with dozens of recurring schedules that I need to revise. Please help.

Thank you much.

 
Please repost this in the Enterprise forum: forum782.