BOE-XI (R2) SP-1, MHF-1, CHF-15

================================

I have two reports in my Enterprise environment that I would like to link using dynamic Hyperlinking.

Report #1 is a list of "Contracts by Region" (landscape)
Report #2 is a "Contract Detail" report (portrait)

I have gone through the steps on pg.426-429 of the BOE Admin Guide, and pg 400-411 of the CR Users guide - but I am obviously missing something.

Both reports run OK by themselves, but when I click on the link to a specific CONTRACT NUMBER from the "Contracts by Region" report, I get the following error...


ERROR: Error in File C:\DOCUME~1\CRYSTAL\LOCALS~1\Temp\{F7E94299-4691-4BE3-9BBD-DC9173E6F94B}.rpt: Get/Drill report part(s) failed - the data context '/459002' is not valid.


If I run the "Contract Detail" report by itself using the same CONTRACT NUMBER, I get results.

Anyone seen this before. Thanks in advance for the advice
 