Project 2007 - cost field changes - inadvertent

Status
Not open for further replies.

FallingRockAhead

Technical User
May 22, 2007
1
US
Simple set up: With MS Project 2007, set up for calculations based on Physical % Complete. Schedule is a cost loaded, baselined schedule. Show (for example) cost1 field set up for summing. Show the baseline cost field and the cost field. Some tasks should have a P%Compl > 0. Copy the Baseline Cost column into the Cost1 field. This will change almost all (but not all) of the Cost field numbers if P%Compl > 0 (and Baseline Cost field does not = Cost field).

Okay, what's this about? It does not seem to affect the EAC, BCWS, BCWP, etc.

Thanks,
Tom

 
Can you create a small project that demonstrates the issue and email it to me at pdqbach4100 at H0TMAIL and we can discuss this at length.
 