I have Networker 6.0 and have programmed backups and manuals backups of a same one client, each one of the backups programmed with a date of retention different, one of 7 days (backups daily), 2 weeks (backups weekly) and 3 months (backups monthly), y the manual backups have a date of expiration of 4 days.
The problem is that the manual backups take the date from greater retention of the programmed backups (3 meses).
Consult in the documentation and you say that to networker it works this way. Somebody can to help me to solve my problem to give a date of retention to the manuals backups.