Using Premier 6.0
When putting two clips together on the timeline (first half of movie with second half), and then exporting timeline as one complete movie, is it necessary to have to 'build a preview' of the entire 2 clips before able to export?? The complete video is something around 1.5 hrs long, and when I try to export to movie, the little progress window say there is only around 560 frames, which, obviously can't be correct, so I stop it.
Thank you.
Paul
When putting two clips together on the timeline (first half of movie with second half), and then exporting timeline as one complete movie, is it necessary to have to 'build a preview' of the entire 2 clips before able to export?? The complete video is something around 1.5 hrs long, and when I try to export to movie, the little progress window say there is only around 560 frames, which, obviously can't be correct, so I stop it.
Thank you.
Paul