Hello, I have a windows 2003 server running exchange. It has 2 emulex HBAs connected to two old Brocade switches and cx700. We will be moving the host to two new Cisco MDS switches one at a time while the system stays up serving email.
Is there a powermt command to safely pause all acctivity on one HBA while I unplug from the old brocade and plug into the new MDS? I will then zone to the first new MDS switch - do a rescan from disk admin to discover all Luns on first hba. If all works well I will follow the same procedure for the second HBA.
I see a powermt set mode standby and also powermt remove. I'm using Power Path 4.2 on these older servers. I need to prove to the Exchnage guys that I can do this safely without interupting email.
Thanks - Brad
Is there a powermt command to safely pause all acctivity on one HBA while I unplug from the old brocade and plug into the new MDS? I will then zone to the first new MDS switch - do a rescan from disk admin to discover all Luns on first hba. If all works well I will follow the same procedure for the second HBA.
I see a powermt set mode standby and also powermt remove. I'm using Power Path 4.2 on these older servers. I need to prove to the Exchnage guys that I can do this safely without interupting email.
Thanks - Brad