Dear expert,
I am going to power down two Avaya SE and three IPO500.
What is the normal procedures for:
1. Primary se
2. Secondly se
3 IPO500 which connect the idap and analog extensions.
Also should I press the se power button after shounting down the server? Or just unplug the power cables?
I am going to power down two Avaya SE and three IPO500.
What is the normal procedures for:
1. Primary se
2. Secondly se
3 IPO500 which connect the idap and analog extensions.
Also should I press the se power button after shounting down the server? Or just unplug the power cables?