chrism2278
IS-IT--Management
We have multiple production locations and we do have a single bom per item (there was a previous thread on this I read).
However, we have different cost types by location. For example labor at one site is more expensive than the other.
There seems to be no way to affiliate a value added cost type to a bom by location.