I am having a problem with my unit cost in PO. It is pulling a completely random number (to me, at least) and using it for the cost.
We are on average costing. I VI'd a new price file for the line, replacing EVERY possible cost (landed, average, allocated, standard)with the same value, yet I am still getting a different cost. I'm sure this is a calc somewhere in the PO Setup screen, but I've tried changing it from Allocated Cost to non-Allocated Cost, and it still pulls this strange number.
I know that previous to my VI, the price it's using now is most likely the old average cost. My question is twofold: is there a way to tell the PO module to use the standard cost (if we're on average costing), or a specific cost? Second, is there a way to tell where this number is coming from?
Thanks!
We are on average costing. I VI'd a new price file for the line, replacing EVERY possible cost (landed, average, allocated, standard)with the same value, yet I am still getting a different cost. I'm sure this is a calc somewhere in the PO Setup screen, but I've tried changing it from Allocated Cost to non-Allocated Cost, and it still pulls this strange number.
I know that previous to my VI, the price it's using now is most likely the old average cost. My question is twofold: is there a way to tell the PO module to use the standard cost (if we're on average costing), or a specific cost? Second, is there a way to tell where this number is coming from?
Thanks!