Hi,
We are using Project & Job Costing in our Accpac.
In the recent transactions we encountered an error when we try to post the PJC Timecards.
Description: Overflow. Maximum entry number has been generated for batch 000023.
Description: Internal error. jrnlh recordgenerate call ( 3114 GPGLPO1.C).
Does anyone know a solution to this problem?
We are using Accpac 5.5 and Oracle 10g.
We are using Project & Job Costing in our Accpac.
In the recent transactions we encountered an error when we try to post the PJC Timecards.
Description: Overflow. Maximum entry number has been generated for batch 000023.
Description: Internal error. jrnlh recordgenerate call ( 3114 GPGLPO1.C).
Does anyone know a solution to this problem?
We are using Accpac 5.5 and Oracle 10g.