If I have a Purchased Item that I want to show the components of, but will never inventory or buy those component items and don't want the system to tell me I need them (MRP), how do I show them in the Bill Of Materials? Is Phantom Bill the answer, or is there a better way?
Thanks in advance.
Thanks in advance.