I have a report that contains approx 9 subreports, each of which is passed a date parameter {?Running Date}.
When the report was initially specified there was no indication given that this was not satisfactory. However now we want to set up a schedule and we want it to always run for todays date. Unfortunately at the moment if you set up a schedule then it will always run for the specified date and not todays date.
What I wanted to do was a another parameter, something like {?Use Current Date} which if checked would override the value of the {?Running Date} parameter before it is passed into the subreports.
I could change the subreports to take this extra argument and deal with the situation at the sp level (SQL) but I wondered if there was a quicker way.
My other thought was could I use a formula and then pass this in as the argument to the subreport but this didnt seem to be possible.
Any Further Assistance would be very gratefully received