daveweinst
MIS
I'm trying to find out if you can modify the start date and/or finish/due date of a task through outlook (2003) then be able to upload into Office Project web access (2007).
This was originally posted by hrm1220, but was closed.
I have the same problem.
Does any one know if this is possible?
Thx
thread913-1500685
This was originally posted by hrm1220, but was closed.
I have the same problem.
Does any one know if this is possible?
Thx
thread913-1500685