Hi all,
I am not sure if this is the right forum to ask my Query.
Is there anyway I can read the current OPC plan & job status (run time) through Rexx?
Is there any routine to interface the 5.2.
I want to know the list of failed jobs in OPC at run time.
Is this possible?
I tried to go through the Tivoli workload scheduler Programing interfaces; but found it too technical.
Any pointers, examples or help would be greatly appreciated.
Thanks.