Hi. I recently had to change servers, in doing so I also needed to transfer Accpac to the new server. The server is running Novell 5.1 and I believe Accpac is 6.5 (dos ver). The Accounting Dept. can no longer access the G.L. information. We get the error "program file is missing". I have triple chacked the files and they are all there compared to the old server( which is still running)
Is there a system file that needs to be modiied?
Thanks Bob g.