jmmurray66
IS-IT--Management
I have a new PRI being installed to replace an existing one. The new provider could not exactly match the existing config exactly. It's been a while since I have done this.. can I just modify the existing DCH, route and trunks or does everything need to be outted and rebuilt?
Thanks.
Thanks.