Apr 28, 2015
20
US
I am going to be moving my VM Pro distributed system (3 sites) to a Centralized system (1 Site + 1 Failover). Does anyone have the steps to move to a new VM server? I am hoping to keep all the existing VM's, Greetings, Names and AA's.

Thanks in advance,
Michael
 
All mailboxes should be on the central server anyway so the only thing needing moving the central server should be the VM callowness

if these have been programmed as modules then it is fairly easy to export & import them the custom greetings from the wavs directory would also need copying over (I hope they have unique names otherwise you will have to adjust the call low & rename them)

why remove the distributed servers if they are already configured - the licence has been paid for & they will be reducing the load on your SCN link.


A Maintenance contract is essential, not a Luxury.
Do things on the cheap & it will cost you dear
 
We have had issues with the distributed system syncing properly. We also closed one of the sites and now have 1gbps/1gbps at the main location. Bandwidth will not be an issue.
 