we are now on 5.5ep. have set up a new system with 6.5 this was a test system and would like to make it live how would I move the 250 users? and all old mail mailbox settings
I'm doing a 5.5ep to 6.5 upgrade this weekend for 80 users, I'll let you know what I run into. It's only a single site, so it will be easy.
Pretty much my plan follows a simple service pack roll out. This will be my first upgrade to 6.5, but from what I have read, all I need to do is extend the schema, install the agents and load them. The rest is dealing with the client roll out. Pretty much the only change if you have more than one site is the timing, the actuall tech work is pretty similar.
After mu backup I ran the install and created my new software store. Extended the schema, then installed the agents. At first run, my database files did not convert. Even though the install went with out errors, the DC files did not copy over to the PO directory. Once I copied them from the software store to the po directory and restart the POA, the databases converted with out issue.
used ZEN to distribute the new client.
Pretty much the only real problem I have right now is with document managment. The default author setting is not holding (assistance make the lawyer they work for the author of all documents), small and stupid issue, but important to a lawfirm. Have no info on this goofy issue, NTS is testing my DB files right now.
Provogeek
In my other post I talk about exporting the users i dont want the mail just the users and there info. I hate to type and it takes to long to enter all the users info looking for easy way out
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.