MitelInMyBlood
Technical User
Interesting to note that 3300 rls 7 software is using SX2K call control ver 37 (is this Lightware 37?)
If so, at this point the 3300 would seem to have jumped two full major stream releases ahead of the SX2K (which is still at LW34)
Another interesting anomaly, if I may. Mitel in describing their Resiliency option once stated the design was intended to allow a catastrophic loss of the primary controller without losing a call in progress. However, contrast this statement to product training documentation (Rls 7) for the "Resilient T1/E1 combo card" which states that calls in process are in fact lost if the primary controller fails.
Optional dual redundant power supplies and dual drives with RAID mirroring of the file system in the new MXe controller is a step in the right direction, but Control Resiliency is still not Control Redundancy, no matter what anyone tells you.
If so, at this point the 3300 would seem to have jumped two full major stream releases ahead of the SX2K (which is still at LW34)
Another interesting anomaly, if I may. Mitel in describing their Resiliency option once stated the design was intended to allow a catastrophic loss of the primary controller without losing a call in progress. However, contrast this statement to product training documentation (Rls 7) for the "Resilient T1/E1 combo card" which states that calls in process are in fact lost if the primary controller fails.
Optional dual redundant power supplies and dual drives with RAID mirroring of the file system in the new MXe controller is a step in the right direction, but Control Resiliency is still not Control Redundancy, no matter what anyone tells you.