MechDriver
Vendor
I have a 81c that will soon become succession 4.50.
Also Meridian Mail with 200hrs Max on the system. Approx. 120 hrs. used.
When checking out the docs for time to convert with the migration utility I found that the docs say it could take days.
Has anyone migrated a system this large? How long did it take to make the migration tapes from the MM? Does the MM have to stay offline during the migration/backup process or just while the migration utitity is upgraded onto the MM?
Thanks
Also Meridian Mail with 200hrs Max on the system. Approx. 120 hrs. used.
When checking out the docs for time to convert with the migration utility I found that the docs say it could take days.
Has anyone migrated a system this large? How long did it take to make the migration tapes from the MM? Does the MM have to stay offline during the migration/backup process or just while the migration utitity is upgraded onto the MM?