We have an MM 1.1 for Exchange. Failed Call Me notification attempts are showing up with dates wrong, month & day are reveresed. i.e. Re-scheduled for 3/1/2007 instead of 1/3/2007. Noticed after 1st of year. We have checked the user & callerinterface and it is set to US English. Looks like a boug, sondering if anyone else has seen it.