username124
Technical User
Micros RES 5.2 installed with 4 different revenue centers using labor management. Currently, I have a hourly manager that is responsible for 3 out of 4 of the revenue centers within our system. Ideally, since this manager has responsibility over 3 of the 4 revenue centers, I'd like their hourly wage to be equally divided between the 3 revenue centers any time they clock-in, regardless of which RVCs workstation they sign into. Currently, I have given them a job code that isn't assigned to any revenue center at all and am assuming their labor cost just isn't calculated in reports that list revenue center specific labor costs. Will I have to continue calculating that additional cost of their labor manually or is there a work around that will include their correct labor cost to the revenue centers I specify?