Next week (12/29-30) I'll be taking down our Merlin Legend/Magix phone system (w/Merlin Messaging) so that I can physically move the system to allow room for an add-on carrier. So, my first question is:
1) Is there a preferred sequence for powering down/up the cabinets? Maybe it doesn't matter but in case it does I want to minimize any 'harm' that can come from powering down/up. We've got two fully populated carriers right now.
The other questions are with regard to the add-on carrier:
1) Once I move the system should I re-patch all the extensions, etc. and re-power it to make sure everything works prior to installing the add-on carrier?
2) Or should I install the add-on carrier, along with the additional modules (2 - 016 MLX), and then power up? Again is the sequence important?
Yooper-Ken
1) Is there a preferred sequence for powering down/up the cabinets? Maybe it doesn't matter but in case it does I want to minimize any 'harm' that can come from powering down/up. We've got two fully populated carriers right now.
The other questions are with regard to the add-on carrier:
1) Once I move the system should I re-patch all the extensions, etc. and re-power it to make sure everything works prior to installing the add-on carrier?
2) Or should I install the add-on carrier, along with the additional modules (2 - 016 MLX), and then power up? Again is the sequence important?
Yooper-Ken