The users from our stream a experiencing unacceptable system slowdowns, particularly on Thursdays. They need to run the MSB700 and other reports for their weekly planning meetings. It appears that some Labor costing MSBnreports are being run along with some other Financial programs at the same time they are trying to run reports/batches necessary for the planning meetings. Mincom has ncountered this at other sites and to resolve this conflict they have seen where a company has developed a policy that all other streams try to restrict the use of the MSB programs on the time of the day ( one day each week) that Maintenance needs to utilize the system for their planning reports/runs. <br>
<br>
I have seen the same problem at a lot of sites and what we found out was the system was not set up properly by MINCOM. The pick slips, scheduling (msb700 and 740), and work order job cards (msr623) should be threaded differently. They should be the only items on this single thread. The MSB700, MSB740 and MSR141 should be able to be run at any time and should be instant.<br>
<br>
I have seen the same problem at a lot of sites and what we found out was the system was not set up properly by MINCOM. The pick slips, scheduling (msb700 and 740), and work order job cards (msr623) should be threaded differently. They should be the only items on this single thread. The MSB700, MSB740 and MSR141 should be able to be run at any time and should be instant.<br>