Is there a way to set a time limit on the amount of time a job is allowed to take? I had a server lock up over the weekend and Arcserve sat on the job for the entire weekend causing all the other scheduled jobs to not run. I was wondering if there was a way to set a time out for something like this. I couldn't find a way to set up an alert for this. Thanks!
Heather
Heather