Hi,
i have a scheduled job running once a week,rebooted the media server this morning and this job shows up as having ran 6 times.
why is this happening ?
thanks
 
Do you have it setup as re-occuring?

Place it on hold and re-create another job off the same selection list
 
also go in and look at the logs, see WHEN the 6 phantom backups occurred.
 