Hello,
I really hope someone can guide me with my problems. We have found and fixed what was causing my problems but I don’t know how to fix the Jobs that already had transactions started. The problems were caused by…
1 - Methods created for a part and Job was created before the Cost got rolled up.
2 - Not all the material cost was rolled up at the time the Job was created, method corrected but not sure how to correct the Job.
3 - Method updated and rolled up but How to correct Jobs already on the shop floor with production started.
The Jobs already has Transactions on them so I can not delete the Job and re-create the Jobs. This caused my WIP report have a LOT of MFG-VAR Debit because the cost of when the job was started was zero dollars.
Is it possible to get the correct cost into the Job then close it so WIP report is correct?
We have around 100 or so Jobs I need to fix before I can close them. These parts are STD cost method. HELPPPPP
Thanks,
Lakesidepat
I really hope someone can guide me with my problems. We have found and fixed what was causing my problems but I don’t know how to fix the Jobs that already had transactions started. The problems were caused by…
1 - Methods created for a part and Job was created before the Cost got rolled up.
2 - Not all the material cost was rolled up at the time the Job was created, method corrected but not sure how to correct the Job.
3 - Method updated and rolled up but How to correct Jobs already on the shop floor with production started.
The Jobs already has Transactions on them so I can not delete the Job and re-create the Jobs. This caused my WIP report have a LOT of MFG-VAR Debit because the cost of when the job was started was zero dollars.
Is it possible to get the correct cost into the Job then close it so WIP report is correct?
We have around 100 or so Jobs I need to fix before I can close them. These parts are STD cost method. HELPPPPP
Thanks,
Lakesidepat