peopleperson88

Technical User
Aug 8, 2002
46
US
I'm currently running Exchange 2000 with Sp3 and Post Roll SP3 rollout.

I'm running the following command;

isinteg -s <servername> -fix -verbose -l isinteg.log -test alltests

The results are displayed below:

Test Search Folder Links result: 0 error(s); 0 warning(s); 0 fix(es); 0 row(s);
time: 0h:0m:28s
Test Global result: 0 error(s); 0 warning(s); 0 fix(es); 1 row(s); time: 0h:0m:0
s
Test Delivered To result: 0 error(s); 0 warning(s); 0 fix(es); 62 row(s); time:
0h:0m:1s
Test Repl Schedule result: 0 error(s); 0 warning(s); 0 fix(es); 0 row(s); time:
0h:0m:0s
Test Timed Events result: 0 error(s); 0 warning(s); 0 fix(es); 0 row(s); time: 0
h:0m:0s
Now in test 6(reference table construction) of total 19 tests; 100% complete.
Now in test 6(reference table construction) of total 19 tests; 100% complete.
Now in test 6(reference table construction) of total 19 tests; 100% complete.
Now in test 6(reference table construction) of total 19 tests; 100% complete.
Now in test 6(reference table construction) of total 19 tests; 100% complete.
Now in test 6(reference table construction) of total 19 tests; 100% complete.
Now in test 6(reference table construction) of total 19 tests; 100% complete.
Now in test 6(reference table construction) of total 19 tests; 100% complete.
Now in test 6(reference table construction) of total 19 tests; 100% complete.
Now in test 6(reference table construction) of total 19 tests; 100% complete.

Isinteg: the request to cancel verification process failed.
Isinteg: the request to stop verification process failed.
The verification has probably been interrupted.

So I check the log and it reads this:


Starting test 6 of 19, 'reference table construction'
ref table construction on INID returned JET_errInvalidBufferSize

There is nothing on MS site or TechNet. Can someone PLEASE help me with this issue. There is an error somewhere in the DB but I can't seem to find out where or how to fix it.
 