I have been asked to install a 25 pair cable in plastic conduit underground from the middle of one building to another building 700 feet away. Is the irob required? I assume the irob is fuse protection on the copper pairs.
Also the main building where the partner system is located will have 20 sets and the far building will have 8 sets is there any problem with this setup?
Also the main building where the partner system is located will have 20 sets and the far building will have 8 sets is there any problem with this setup?