Hi,

In Informatica schedule, I have to something like this ...

Run the Work Flow, every Monday to Friday from 2 am to 5 am each 15 minutes. How to do this ?

I did some trial and error and could find that We can do a scheduling for the daily basis in certain frequency, but not within a time slot (like 2 to 5 am or so) of a day.

Is it possible to accomplish in Informatica ??

Thanks.
 
Look in documentation for event-based scheduling, indicator files.

Your operating system will have to do the job in this case....

T. Blom
Information analyst
tbl@shimano-eu.com
 
" event-based scheduling, indicator files " is not helpful for this situation ...
 