I have been trying to import very basic information into Project 2003 std edition. The excel sheet has the Start date for the main Task (which is a contract) and assigned an outline level 1 as 30-sep. Under this task there are sub task with different durations assigned outline level 2. I would think that Project would take the start date and add the hours of duration and using the Predecessors to give me a schedule. But it keeps on starting to schedule at the 13th of Sep instead of the 30th. There is a total of 86 hours. Thanks for you input.
Jay
I have been trying to import very basic information into Project 2003 std edition. The excel sheet has the Start date for the main Task (which is a contract) and assigned an outline level 1 as 30-sep. Under this task there are sub task with different durations assigned outline level 2. I would think that Project would take the start date and add the hours of duration and using the Predecessors to give me a schedule. But it keeps on starting to schedule at the 13th of Sep instead of the 30th. There is a total of 86 hours. Thanks for you input.
Jay