Hi all,
I have a small setup which has IC only. I want to change the cost method in IC Accounts sets but its giving me a message that i must run day end first before i change. I can't run day end as the system is not intergrated with the GL thus day can't run.
Is there a status that i can change some where so that i can change the costing method.
Ver 5.4
DB Oracle
Regards.
I have a small setup which has IC only. I want to change the cost method in IC Accounts sets but its giving me a message that i must run day end first before i change. I can't run day end as the system is not intergrated with the GL thus day can't run.
Is there a status that i can change some where so that i can change the costing method.
Ver 5.4
DB Oracle
Regards.