Hi,everyone
I use Legato NetWorker 6.l.1 on IBM H80(AIX 4.3.3) with Borcade SAN Switch and ATL P7000 library,and I still have 20 SAN Storage Node to backup to library by FC.
My question is CPU always occupied by nsrd process,and server is too busy,after 4-5 days,nsrd process hang,and have to restart nsr process to backup.
Can someone tell me how to solve this problem?
Thanks
I use Legato NetWorker 6.l.1 on IBM H80(AIX 4.3.3) with Borcade SAN Switch and ATL P7000 library,and I still have 20 SAN Storage Node to backup to library by FC.
My question is CPU always occupied by nsrd process,and server is too busy,after 4-5 days,nsrd process hang,and have to restart nsr process to backup.
Can someone tell me how to solve this problem?
Thanks