Hi,
I have say 100 computers with identifying asset numbers in GH2c as a column(location) .
Similarly I have 1 month, 3 months, 6 month, 9 month etc in Gh1c -- these represent the number of computers that have not been audited in these months.
Now i want to create the location in GH2c as a hyperlink to be drilled down.
I already have chart in Gh1b that does the drill down -- but the chart does not give a break down. All it shows is the location and count of computers not audited. Its only when its drilled down it gives the breakdown by months.
So I am trying to replace the chart by hyper linking the location and trying a drill down in that.
How feasible is this?
Thanks
bob
I have say 100 computers with identifying asset numbers in GH2c as a column(location) .
Similarly I have 1 month, 3 months, 6 month, 9 month etc in Gh1c -- these represent the number of computers that have not been audited in these months.
Now i want to create the location in GH2c as a hyperlink to be drilled down.
I already have chart in Gh1b that does the drill down -- but the chart does not give a break down. All it shows is the location and count of computers not audited. Its only when its drilled down it gives the breakdown by months.
So I am trying to replace the chart by hyper linking the location and trying a drill down in that.
How feasible is this?
Thanks