I am using an SQL 2005 system.I recently got a new backup server. Last month it took me a couple of days to copy my existing database onto the backup server. I did have a problem copying one database which was 85G. My boss tasked my with keeping the production server in sync with the test server. I know my boss was talking about the data but I am also interested in keeping the stored procedures in sync if this is possible. Data only gets entered into the system during the first ten days of the month so I only need the syncing to occur once a day during the first ten days of the month. Is it possible to do this or do I just use the backups from the production server?