Hi,
I've an install of CE 8.5 with several scheduled reports with destination output to unmanaged disk.
I need to change the disk location - which I can do under Destinations. However even though the change is accpeted, when the job next runs, it runs to it's old location. I checked the reoccurance, and sure enough, it didn't pick up the change.
How do you edit the schedule - or do I have to delete the current schedule and create a new one that will pickup the changes.
Thank you for any insight you can provide![[peace] [peace] [peace]](/data/assets/smilies/peace.gif)
Melissa Rush
a.k.a. DaBuggs
I've an install of CE 8.5 with several scheduled reports with destination output to unmanaged disk.
I need to change the disk location - which I can do under Destinations. However even though the change is accpeted, when the job next runs, it runs to it's old location. I checked the reoccurance, and sure enough, it didn't pick up the change.
How do you edit the schedule - or do I have to delete the current schedule and create a new one that will pickup the changes.
Thank you for any insight you can provide
![[peace] [peace] [peace]](/data/assets/smilies/peace.gif)
Melissa Rush
a.k.a. DaBuggs