my customer has a cluster of 8 MiVB 7.0 and a standalone Nupoint.
on the Nupoint I have 600 VM and 150 call flow VM, we are planning to migrate the Nupoint to a new Micollab server.
I know that there is noway to go with a backup/restore.
is there a way to speed up the proccess other than creating all the VM and call flows one by one? (just for the call flow, it gone take me for ever to duplicate the configuration),. any one has done this before? what are the best practices?
Thanks.
on the Nupoint I have 600 VM and 150 call flow VM, we are planning to migrate the Nupoint to a new Micollab server.
I know that there is noway to go with a backup/restore.
is there a way to speed up the proccess other than creating all the VM and call flows one by one? (just for the call flow, it gone take me for ever to duplicate the configuration),. any one has done this before? what are the best practices?