Hi all,
we have at a remote site 2 DS24M2 switches each being a seperate fabric and connected over nishan 1620's to other site's with other fabrics.
We want to replace the DS24M2 switches at the remote site with ED140M switches.
The ED140's will fully replace the DS24M2 so all local storage and hosts including the connections to the nishan 1620's will go to these new switches.
As this is in a live environment we want to do this with the least outage and risk possible.
I'm now looking for whitepapers or other work instructions on how to do this.
Any good advise or documentation on this would be very welcome.
(I already searched emc's powerlink, but not found much yet)
we have at a remote site 2 DS24M2 switches each being a seperate fabric and connected over nishan 1620's to other site's with other fabrics.
We want to replace the DS24M2 switches at the remote site with ED140M switches.
The ED140's will fully replace the DS24M2 so all local storage and hosts including the connections to the nishan 1620's will go to these new switches.
As this is in a live environment we want to do this with the least outage and risk possible.
I'm now looking for whitepapers or other work instructions on how to do this.
Any good advise or documentation on this would be very welcome.
(I already searched emc's powerlink, but not found much yet)