Hello everyone,
I would like to know how to total up all the durations on the critical path so I can see how long the critical path was before and after updating and rescheduling. Is there a simple solution other than exporting durations and totalising them after filtering for CP tasks.
Thank you Alex
I would like to know how to total up all the durations on the critical path so I can see how long the critical path was before and after updating and rescheduling. Is there a simple solution other than exporting durations and totalising them after filtering for CP tasks.
Thank you Alex