Hi all,
I'm looking at re-writing some PowerBuilder reports in CE.
These are batch reports that run in the evenings.
CE needs to be smart enough to check for the completion of reports and if there is failure, to be capable of pausing while the failed report is re-run.
I need to be able to set other reports in the workflow to run in parallel.
I think the Event will handle alot of these requirements, has anyone run into a batch requirement that CE cannot perform?
Doug
I'm looking at re-writing some PowerBuilder reports in CE.
These are batch reports that run in the evenings.
CE needs to be smart enough to check for the completion of reports and if there is failure, to be capable of pausing while the failed report is re-run.
I need to be able to set other reports in the workflow to run in parallel.
I think the Event will handle alot of these requirements, has anyone run into a batch requirement that CE cannot perform?
Doug