Have a student who has six drives in library idle, but when he clones his volumes manually he can only get one volume to clone at a time. The others queue up. I called Legato and was told that is how NetWorker is set up. But I find it hard to believe. Is there anyone who has had multiple volume clones running at the same time, using same storage node and library with multiple drives being used? Thanks.