Here's my problem.
I run a GFS rotation with the full backups running on Saturday night. 2 weekends ago the full backup failed, so when I came in Monday morning I made a scheduling change to run an additional full on Monday nights. I had the intention of changing the schedule back to show only a full on Saturday nights, but I forgot to change it back.
This past weekend a full ran on Saturday night as normal with no problems. Last night (Monday) however it ran a full again, this time using the monthly pool tapes, and when I came in this morning it was hung about 1/2 way through the backup because I didn't have enough monthly pool tapes mounted.
I stopped the backup, changed the schedule to reflect a full backup only on Saturday nights. So, finally here is my question
How can I force Arcserve to use the monthly pool tapes this Saturday night instead of using the weekly pool tapes?
I run a GFS rotation with the full backups running on Saturday night. 2 weekends ago the full backup failed, so when I came in Monday morning I made a scheduling change to run an additional full on Monday nights. I had the intention of changing the schedule back to show only a full on Saturday nights, but I forgot to change it back.
This past weekend a full ran on Saturday night as normal with no problems. Last night (Monday) however it ran a full again, this time using the monthly pool tapes, and when I came in this morning it was hung about 1/2 way through the backup because I didn't have enough monthly pool tapes mounted.
I stopped the backup, changed the schedule to reflect a full backup only on Saturday nights. So, finally here is my question
How can I force Arcserve to use the monthly pool tapes this Saturday night instead of using the weekly pool tapes?