Hi All
Bit of an odd question but hoping someone can help.
We have a hipath/realitis 3000 that I'm in the process of stripping the patching for the lines out of the building before we decommission the system (Slow progress)
Facilities are starting a project to replace the aircon systems in our comms rooms and are looking to reduce the capacity in the pbx room since it will no longer have the PBX in it.
Im wondering if there are any steps I can take to reduce the heat output of the system while its in its current limbo state?
For example can the battery cabinet be bypassed & the system run directly from the mains?
Thanks
Grant
Bit of an odd question but hoping someone can help.
We have a hipath/realitis 3000 that I'm in the process of stripping the patching for the lines out of the building before we decommission the system (Slow progress)
Facilities are starting a project to replace the aircon systems in our comms rooms and are looking to reduce the capacity in the pbx room since it will no longer have the PBX in it.
Im wondering if there are any steps I can take to reduce the heat output of the system while its in its current limbo state?
For example can the battery cabinet be bypassed & the system run directly from the mains?
Thanks
Grant