Customer has decomissioned IPR 2 from their system. When the cabinet is powered down, the main floods the network with broadcast messages. I want to use the RST IPR 2 and RST IPM 2 commands in ld 117 to allow the cabinet to be powered down. Is this the correct proceedure and does it require a reboot of the main cabinet? Survivability is not configured.