Is there some equivalent of object grouping for tasks in Project 2000?
I have a series of tasks, each with the sub-task "Design", which is not the exact same sub-task, but rather a different instance of the same tasks that may occur at a different time and have a different duration. But, I may want to make some sweeping change to all the instances of Design, for example changing all their constraint types from "As Soon As Possible" to "As Late As Possible."
As far as I know, the only way to do this is to Ctrl-select them all and change them like that, and with Project, there is a limit to the number of items you can simultaneously select like that.
So, if I could add them to some group whereby I can change the properties of the whole group, that would be awesome.
Thanks.
I have a series of tasks, each with the sub-task "Design", which is not the exact same sub-task, but rather a different instance of the same tasks that may occur at a different time and have a different duration. But, I may want to make some sweeping change to all the instances of Design, for example changing all their constraint types from "As Soon As Possible" to "As Late As Possible."
As far as I know, the only way to do this is to Ctrl-select them all and change them like that, and with Project, there is a limit to the number of items you can simultaneously select like that.
So, if I could add them to some group whereby I can change the properties of the whole group, that would be awesome.
Thanks.