I need a graph as shown below
CR 8.5
|
|
|
| HH
| HH HH HH
| HHXX HH HHXX
| HHXX HHXX HHXX
| HHXX HHXX HHXX
|------------------------------------
Step1 Step2 Step1
------------ -----------
WorkStation1 WorkStation2
This graph is created for each workstation with the steps against number of units produced(target number, obtained number).
Is it possible to create a graph like this???
CR 8.5
|
|
|
| HH
| HH HH HH
| HHXX HH HHXX
| HHXX HHXX HHXX
| HHXX HHXX HHXX
|------------------------------------
Step1 Step2 Step1
------------ -----------
WorkStation1 WorkStation2
This graph is created for each workstation with the steps against number of units produced(target number, obtained number).
Is it possible to create a graph like this???