I need a graph as shown below

CR 8.5

|
|
|
| HH
| HH HH HH
| HHXX HH HHXX
| HHXX HHXX HHXX
| HHXX HHXX HHXX
|------------------------------------
Step1 Step2 Step1
------------ -----------
WorkStation1 WorkStation2


This graph is created for each workstation with the steps against number of units produced(target number, obtained number).

Is it possible to create a graph like this???
 
It looks like you would use two "on change of" fields in the advanced tab: {table.workstation} and {table.step}, with the summary of sum of {table.unitsproduced}.