Hi all
I've got a continuous job running in a 24*7 factory environment. We get buildups of spooled files at status FIN and from time to time we'll get an escape message saying that we've reached the max no of spooled files, so we have to end and restart the job. We've increased the max "to the max" already. Finding a convenient time to end and restart the job is difficult in the factory as it's connected to various robots and stuff that I don't understand!
Is there any way of systematically:
- detecting the build-up of spooled files
- and/or getting rid of them without ending the job?
Help appreciated.
I've got a continuous job running in a 24*7 factory environment. We get buildups of spooled files at status FIN and from time to time we'll get an escape message saying that we've reached the max no of spooled files, so we have to end and restart the job. We've increased the max "to the max" already. Finding a convenient time to end and restart the job is difficult in the factory as it's connected to various robots and stuff that I don't understand!
Is there any way of systematically:
- detecting the build-up of spooled files
- and/or getting rid of them without ending the job?
Help appreciated.